Dismayed at decision (Colin Rendall)

I was greatly dismayed to read that the Scottish energy minister has given his approval for Viking Energy’s folly in the Lang Kames.

The project does indeed qualify as a “folly”, in that it is being undertaken in spite of the huge, identifiable, measurable and known likelihood that “it will all end in tears”. As a Quaker I strongly disapprove of gambling; but for those under no such moral restraint, an “accumulator” on one to six of the following seven propositions might be a nice little earner.

1. The “building phase” will come in well over budget;

2. The “building phase” will have measurable and as yet unacknowledged (by Viking Energy) external costs (including measurable dis-amenity) which will be borne by the Shetland community (people and enterprises) and not by Viking Energy;

3. The measured power output of the “farm” in operation will fall embarrassingly short of Viking Energy’s published projections;

4. The project will provide far less than the promised £30 million annually for Shetland;

5. The pace and direction of change in the “renewable, carbon free” energy sectors is such that wave-power, geo-thermal and new-nuclear may overtake wind in long-term economic viability and commercial attractiveness during the early lifetime of the Viking Energy’s Shetland project;

6. Viking Energy may not be able to weather an eventual thorough legal scrutiny of its campaign to bring the “farm” to Shetland;

7. There is still great uncertainty surrounding the proposed (and commercially vital “connector”); at the moment finance for that project has yet to be confirmed.

Colin Rendall
17 Moor View,
Melkridge,
Haltwhistle,
Northumberland.

NO COMMENTS

Add Your Comment

Add Your Comment

Please note, it is the policy of The Shetland Times to publish comments and letters from named individuals only. Both forename and surname are required.

Comments are moderated. Contributors must observe normal standards of decency and tolerance for the opinions of others.

The views expressed are those of contributors and not of The Shetland Times.

The Shetland Times reserves the right to decline or remove any contribution without notice or stating reason.

Comments are limited to 200 words but please email longer articles or letters to [email protected] for consideration and include a daytime telephone number and your address. If emailing information in confidence please put "Not for publication" in both the subject line and at the top of the main message.

200 words left

logo

Get Latest News in Your Inbox

Join the The Shetland Times mailing list to get one daily email update at midday on what's happening in Shetland.