Emergency dredging at ferry terminal cost £27,000

Emergency dredging has taken place at Gutcher Ferry Terminal to remove a build-up of gravel that was causing damage to the underside of ferries.

The problem became apparent last year when damage to the ferries in Bluemull Sound was reported. The vessels were touching the seabed on the final approach to the Gutcher linkspan, and ferry crews reported a shallow bar of shingle and gravel in the middle of the berth. This was confirmed by a diving survey.

If left untreated, the bar could have caused extensive damage to the stern gear of the vessels, resulting in expensive repairs in dry dock.

Port engineering leader Andrew Inkster told a meeting of the harbour board on Tuesday that dredging from the shore was not possible, but he located a suitable barge-mounted dredger in Buckie Harbour. He said he had to “move fast” as the dredger was due to go to the continent.

The dredger arrived and removed 400 tonnes of material in one night shift. This was disposed of at a site in Yell. The whole operation cost £27,482, and the dredged area now has a depth of three and a half metres below chart datum, that is, below the lowest possible low tide.

Mr Inkster said the build-up of material had been caused by the tide. Hydrographic surveys of ferry terminals and smaller ports had now started to see if the seabed had changed.

NO COMMENTS

Add Your Comment

Add Your Comment

Please note, it is the policy of The Shetland Times to publish comments and letters from named individuals only. Both forename and surname are required.

Comments are moderated. Contributors must observe normal standards of decency and tolerance for the opinions of others.

The views expressed are those of contributors and not of The Shetland Times.

The Shetland Times reserves the right to decline or remove any contribution without notice or stating reason.

Comments are limited to 200 words but please email longer articles or letters to editorial@shetlandtimes.co.uk for consideration and include a daytime telephone number and your address. If emailing information in confidence please put "Not for publication" in both the subject line and at the top of the main message.

200 words left

This site uses Akismet to reduce spam. Learn how your comment data is processed.

logo

Get Latest News in Your Inbox

Join the The Shetland Times mailing list to get one daily email update at midday on what's happening in Shetland.